In Service Training

November 28, 2015

IST photos

Dug out section of the eroded well
Dug out section of the eroded well.
Bottom rebar ready
Bottom rebar ready.
Rebar bending
Rebar bending.
Concrete mixing
Concrete mixing.
Placing the rebar cage in the base
Placing the rebar cage in the base.
Positioning the first layer
Positioning the first layer.
Liz with the WASH staff
Liz with the WASH staff.
A cured top slab.
Pump repair with SETRA
Pump repair with SETRA.
Dutch bricks and back-filling complete
Dutch bricks and back-filling complete.
The technical library: Adama Bagayoko
The technical library: Adama Bagayoko.
Starting the first layer of bricks.
Niger River near downtown Bamako.
Next to a calm Niger River.