In Service Training
November 28, 2015
IST photos
Dug out section of the eroded well.
Bottom rebar ready.
Rebar bending.
Concrete mixing.
Placing the rebar cage in the base.
Positioning the first layer.
Liz with the WASH staff.
A cured top slab.
Pump repair with SETRA.
Dutch bricks and back-filling complete.
The technical library: Adama Bagayoko.
Starting the first layer of bricks.
Niger River near downtown Bamako.
Next to a calm Niger River.