Dug out section of the eroded well.
Bottom rebar ready.
Rebar bending.
Concrete mixing.
Placing the rebar cage in the base.
Positioning the first layer.
Liz with the WASH staff.
A cured top slab.
Pump repair with SETRA.
Dutch bricks and back-filling complete.
The technical library: Adama Bagayoko.
Starting the first layer of bricks.
Niger River near downtown Bamako.
Next to a calm Niger River.